Pakistan energy and load shedding problem solution by biogas
| water tank |
| pvc pipe |
| Add caption |
| cut the top off 1500 l digester tank |
| 1500 l digester tank |
| 1500 l digester tank with hole |
| outlet pipe at top of the tank |
| heat iron pipe for making hole in tank |
| make a 75 mm hole for inlet near the base of the tank on opposite side to the outlet |
| hole in tank |
| pvc pipe |
| Put OUTLET pieces together like this and fit onto the DIGESTER tank |
| For all threaded fittings, apply white thread tape to | improve the seal |
|
| Add caption |
| Apply EPOXY RESIN around ALL joints | touching the tanks to make water/gas |
75mm fittings for the INLET/FEEDPIPE |
| Constructing a Floating Drum Biogas Digester inlet Part 3 |
| biogas tank inlet volve |
| Constructing a Floating Drum Biogas Digester inlet Part 3 |
| Insert FEED PIPE 1.2 m long into TEE |
| Make ½” (12.5mm)hole in the TOP of the gas holder tank. The hole should be near the EDGE of the tank |
| 13.5 mm gas fittings |
| Fit the male adapter to the inside of gas holder tank |
| Add caption |